'Lack of initiative from the project partners' – EC monitoring report

On November 30, the Action team received the Monitoring report on the initial 5 months. The report mainly contains judgments on the design and the quality of the Logical Framework Matrix-logframe presented in the project proposal. It also expresses some ex-ante judgments on the likelihood of the project impact and sustainability on the basis of assessment on the size and the previous experiences of the Partner Organizations, without considering the experience and the professional competence of the experts. They point out that action issues have been listed very well; but there is some confusion between the policy and cultural issues the action is tackling (i.e. the problems upon which the action wants to have a positive impact in front of which the action objectives were conceived) and the issues emerging from project implementation (i.e. the managerial challenges that the manager is facing with the team). However, the monitoring report does not analyze if the project milestones have been achieved in time, nor does it evaluate the consistency of the deliverables or compare the quality of the outputs produced with the quality expected in the action proposal.

Source: Eugad